Infrared Thermography Services - Building Thermography, Air Tightness Testing, Climate Change. Infrared Thermography Services - Building Thermography, Air Tightness Testing, Climate Change. Infrared Thermography Services - Building Thermography, Air Tightness Testing, Climate Change.
Infrared Thermography Services - Building Thermography, Air Tightness Testing, Climate Change. Infrared Thermography Services - Building Thermography, Air Tightness Testing, Climate Change. Infrared Thermography Services - Building Thermography, Air Tightness Testing, Climate Change.

General Information

Domestic Dwellings 2006 Regs

Domestic Dwellings 2010 Regs

Summary of Main Regulation Changes 2006 - 2010

Commercial – Non Dwellings

Pass or Fail?

Pre Test Checklist

Local Wind Report

 
BUILDING REGS 2006 L1A
BUILDING REGS 2006 L1B
BUILDING REGS 2010 L1A
BUILDING REGS 2010 L2A
Call us now on 01935 848 569

Domestic Dwellings 2006 Regs

Where “approved” construction details have been adopted, one test should be carried out on each dwelling type on each development. Separate blocks of flats are treated as separate developments. Each of the following constitutes a change of dwelling type:

Change in method of construction eg timber frame and brick and block

Ground floor, mid floor and top floor flats
End of terrace and mid terrace
Semi detached and detached

Significant changes in building floor area

ie 2 bed / 3 bed

Where “approved” construction details have NOT been adopted, then each dwelling type is to be tested as above but with an increased sampling regime as follows:

Number of dwelling type Number of tests to be carried
out per dwelling type

3 or less

One test of each dwelling type

4 to 40

Two tests of each dwelling type

40 or more

At least 5% of the dwelling type, unless the first 5 units of the tested type achieve the design air permeability, then the frequency can be subsequently reduced to 2%.

For developments with one or two units, one unit must be tested (or two if they are are dissimilar in arrangement or construction type). The only exceptions are if:

The identical construction has been built by the same builder within the past 12 months and successfully passed the air tightness test.

A poor default value of 15m3/h/m2 is accepted in the SAP 2005 calculations.

The Building Control Officer will choose which units are to be tested – in accordance with the sampling regime defined in Part L.

more information

Website design by AztecMedia.eu, Yeovil, Somerset

Valid XHTML! Valid CSS!